Kimball assembly
The hard part is rarely one product. It is four product lines arriving on the same truck.
Kimball projects tend to combine workstation systems, casegoods and ancillary furniture across several lines. Before anything gets built, somebody has to know what is in which carton and what has to go in first.
A furnishings project rather than a furniture delivery
HNI describe Kimball as a design-driven systems and ancillary furniture brand offering a complete range of workplace products along with custom capabilities, and the catalog reflects that. Workstation systems such as Xsite and Narrate sit alongside Priority casegoods, Xsede height-adjustable tables, Traxx and Tiles, and a long list of lounge, bench, stool and table lines.
That breadth is the appeal for a designer and the complication for an installer. A single floor commonly lands as systems furniture plus private office casegoods plus a collaboration area, drawn from different lines with different fasteners, packed across a large number of cartons and delivered together. The install is therefore an inventory and sequencing problem before it is an assembly problem: what is here, what is missing, and what must be standing before the next thing can go in.
It is also why Kimball dealers work layout-first. The usual sequence is design and space planning to confirm the furniture fits the space, the workflow and the growth plans, and only then final pricing, with delivery and installation coordinated to a schedule. That order matters. On a mixed project the drawing is not decoration, it is the document that tells the crew which of four possible things a given carton belongs to.
What it actually takes
Systems runs are the long pole; ancillary is quick but arrives in volume. Both need the layout drawing.
| Model | Time | People |
|---|---|---|
| Receiving and inventorying the deliveryOn a mixed project this is the real first step. | half a day or more | 2+ |
| Building workstation systems runsSquare and level before anything hangs. | a day per cluster, roughly | 2 to 4 |
| Placing and leveling casegoodsHeavy, and the reveals show every error. | per office | 2 |
| Height-adjustable tables and benchingPower routing decides the layout. | faster, but many of them | 2 |
| Ancillary and lounge piecesVolume rather than difficulty. | quick each | 1 to 2 |
| Data and power, alongside the buildSame window as the systems install. | coordinated | trades |
On a mixed floor the schedule is set by what has to be standing first, not by what is easiest to unpack.
What to get right, specifically
Inventory against the drawing before anything is built
On a project that spans several Kimball lines, cartons for different products look far more alike than the finished pieces do, and a missing component is only obvious once you are three workstations in. Check the delivery against the layout and the bill of materials first, by line and by typical, and flag shortages the same day. A shortage identified at receiving is a phone call. The same shortage identified halfway through a run is a crew standing still.
Work the sequence, not the pile
Mixed deliveries invite the wrong instinct, which is to start with whatever is nearest the door. Systems runs generally have to be positioned, squared and leveled before worksurfaces and storage hang off them, power and data want pulling while the runs are open, and casegoods and ancillary go in around a floor that is already set out. Getting that order wrong means moving finished pieces to get access, which is where damage happens on otherwise straightforward jobs.
Layout-first is how these are meant to be bought
Kimball dealers typically run design and space planning before final pricing, confirming that the furniture suits the space, the workflow and the growth plans, and then coordinate delivery and installation to the schedule. It is worth using that properly rather than treating it as a sales step. Changes made on the drawing are free; the same changes made on install day mean re-ordering components from a specific line, and on a mixed project that can hold up more than the piece it affects.
Kimball is part of HNI now, which helps with support and not with parts
HNI completed its acquisition of Kimball International in 2023, bringing Kimball, National, Etc., Interwoven, Kimball Hospitality, D’Style and Poppin into a group that already included HON, Allsteel, Gunlocke and HBF. That is genuinely useful to know, because it consolidates who you deal with for support and parts years down the line. What it does not mean is that the systems are interchangeable. Different lines use different frames, connectors and tiles, so do not assume HON components will work with Kimball ones, and specify replacements by the actual line rather than by the parent company.
Casegoods are judged on the gaps
Private office furniture is heavy, largely pre-assembled, and unforgiving about floors. A credenza that sits slightly out of level next to a desk shows up as an uneven reveal along the whole joint, and nobody looks at the piece, they look at the line where two pieces meet. Level and gang them properly, and check the alignment along a run rather than piece by piece. This is also the part of the job most likely to mark a finished floor, so plan protection and the route in before anything heavy moves.
Decide where power lands before the benching does
Height-adjustable tables and benching bring their own power routing, and on an open floor the position of a power beam or a floor box determines where a run can physically go. Establish that with the electrician early, in the same conversation as the systems infeed, rather than discovering that a bench run is two feet from anywhere it can be fed. As with any powered furniture, the connection to building supply belongs to a licensed electrician.
Protect the finishes, because a lot of this is soft or wood
Kimball’s range leans heavily on upholstered ancillary pieces, wood casegoods and applied tiles, which are less tolerant of a busy site than a steel panel is. Keep upholstered and veneered items boxed until their area is finished, unpack them last, and keep them out of the traffic route while systems work is still going on. On a mixed install the damage rarely happens during assembly; it happens while something else is being carried past.
Before installation day
Get the final layout drawing and the bill of materials, organized by line and by typical, into the installers’ hands in advance.
Agree the build sequence: which systems runs go first, and where casegoods and ancillary fit around them.
Confirm power and data positions with the electrician and data technician, including anything feeding benching.
Plan receiving: where cartons will be staged, and who is checking them against the manifest.
Protect floors and plan the route for heavy casegoods before delivery day.
Confirm the specific product lines in writing, since parts and replacements are specified by line rather than by parent company.
Who this is really for
Organizations furnishing a whole floor rather than adding a few desks. Kimball’s strength is that one specification can cover workstations, private offices and the collaboration and lounge areas between them, with the design coherence that comes from a single design-led range.
That breadth is exactly why the install benefits from people who do this regularly. The individual pieces are not difficult. Coordinating several product families, a large carton count, two other trades and a live building is where projects slip, and it is not a skill you get from having assembled furniture before.
It also suits organizations planning to change. Reconfigurable systems and ancillary furniture that can be moved around are worth more when the floor is set out properly the first time and documented, so the next change starts from a known position rather than a survey.
What an installer does
- Receives and inventories a mixed delivery against the layout and bill of materials before starting.
- Sets the build sequence so systems runs are standing and level before anything hangs or lands around them.
- Builds workstation runs square and plumb, and coordinates the data and power window with the other trades.
- Places, levels and gangs casegoods so reveals line up along a run rather than piece by piece.
- Installs height-adjustable tables and benching around confirmed power positions.
- Unpacks upholstered and veneered ancillary last and protects finishes and floors throughout.
- Documents the final layout so future reconfiguration starts from a known position.
Get it built by someone who has built one before.
Tell us your ZIP and what you bought. Installers near you will quote you directly, and you deal with them, not with us.
Questions people ask
What makes a Kimball install different?
Usually the mix. Kimball span workstation systems, casegoods, height-adjustable tables and a wide ancillary range, so a floor often arrives as several product lines on one delivery. The first job is inventory and sequencing against the layout drawing rather than assembly.
Is Kimball still an independent company?
No. HNI completed its acquisition of Kimball International in 2023, bringing Kimball, National, Etc., Interwoven, Kimball Hospitality, D’Style and Poppin into a group that already included HON, Allsteel, Gunlocke and HBF. It is useful to know for support and parts continuity.
Does that mean HON parts fit Kimball systems?
No, and it is worth being clear about. Shared ownership is not shared componentry. The lines use different frames, connectors and tiles, so specify replacements and additions by the actual product line rather than by the parent company.
Why do dealers insist on space planning first?
Because the specification depends on it. The usual sequence is design and space planning to confirm the furniture fits the space, workflow and growth plans, then final pricing, then coordinated delivery and installation. Changes are free on the drawing and expensive once components have been ordered from specific lines.
What causes most of the damage on these installs?
Carrying things past finished work. Kimball’s range includes a lot of upholstered and wood pieces, which are less forgiving than steel panels. Unpack those last, keep them out of the traffic route while systems work continues, and protect floors and door frames on the route in.
Who connects the power?
A licensed electrician, as with any powered furniture. That includes the systems infeed and anything feeding benching or height-adjustable tables. Confirm power positions early, because on an open floor they determine where a run can physically be placed.
Installers.org is not affiliated with, endorsed by, or sponsored by Kimball or HNI Corporation. Kimball, Xsite, Narrate, Priority, Xsede, Traxx, HON, Allsteel, Gunlocke and HBF are trademarks of their owners, referred to here only to describe the installation services that independent installers on this directory provide.